Prince of Wales Bridge (M4, formerly Second Severn Crossing)

Prince of Wales Bridge (M4, formerly Second Severn Crossing) in England/Wales border (Severn Beach to Caldicot), M4 has no toll. National Highways (Highways England took over on 8 January 2018) publishes the position recorded here as of 7 September 2026; payment and exemption rules depend on the crossing.

Prince of Wales Bridge toll

Toll free since 17 December 2018, like the M48 Severn Bridge. A year on, GOV.UK reported journeys into Wales over it up 16%, at over 39,000 a day.

Does the Prince of Wales Bridge charge cars, vans or lorries?

The M4 crossing is free for every vehicle class that is allowed on a motorway. A car heading from England towards Newport owes nothing; the return trip towards England is free too. The same answer applies to a delivery van, coach, motorhome or articulated lorry. There is no charging period to avoid by travelling at night, and no difference between a weekday and a bank holiday. The former Severn toll was removed on 17 December 2018, not merely suspended for a trial.

Historic westbound charges describe the former scheme. National Highways now maintains the crossing as part of the motorway network.

What a driver pays at the M4 crossing now
JourneyCarVan or HGVAction
England into Wales£0£0Follow the M4 signs
Wales into England£0£0Follow the M4 signs

Free travel began on 17 December 2018. Other journey costs are separate.

Example

A Bristol commuter driving to Newport on five working days

Vehicle
Private car
Route
M4 westbound in the morning, eastbound on the return
Frequency
Five return journeys in a week
  1. The morning journey uses the Prince of Wales Bridge into Wales. Its current bridge charge is £0.
  2. The evening journey crosses into England. That direction also costs £0.
  3. Five return journeys therefore produce a bridge charge of 5 × (£0 + £0) = £0. This is a calculation from the published free crossing rule.

The driver does not need to budget for a Severn toll or register a number plate with a payment service.

How do you check the M4 bridge before setting off?

There is no payment step at the bridge. Use the National Highways Severn Bridges page to check both motorway crossings in your direction. Read planned closures as well as the present status: a bridge could close before you arrive. The operator also publishes daily closures for work on the approaches.

Check again before departure because work can change at short notice. Follow live signs through any diversion. For help with bridge works, contact National Highways at info@nationalhighways.co.uk or 0300 123 5000.

  1. Choose the M4 for the direct route between the English side of the estuary and Newport or Cardiff; check the operator's Severn Bridges status for both directions.
  2. Read any planned closure notice for the time of your journey. If the M4 is affected, check whether the M48 is available for your vehicle.
  3. If the bridge is open, carry straight on, as there is nothing to buy. Obey temporary lane signs and the posted speed limit during works.
  4. If a closure starts while you travel, take the signed diversion. Heavy goods vehicles need to check the M48 weight restriction before using that bridge.

What should you do with a Prince of Wales Bridge toll demand?

A present-day drive over this bridge cannot produce a legitimate unpaid crossing charge because there is no charge to leave unpaid. There is no Severn bridge payment deadline, reduced penalty period, charge certificate or toll appeal process for current journeys. Do not enter your card details merely because a message says you missed a Severn bridge payment. Check the road name and the date on any notice: Dartford and other charged crossings have their own schemes, but they do not turn an M4 Severn journey into a payable trip.

Speed and lane restrictions still apply. If paperwork claims a recent M4 Severn toll, ask National Highways to identify the legal basis and crossing record. Keep the message rather than using an unverified payment link.

What became of the Severn TAG scheme?

Before abolition, frequent travellers could use a Severn TAG for westbound trips. Highways England described Trip TAG top-ups and Season or Shared TAG plans. Direct debit accounts transferred when the bridges came into public ownership; online banking top-ups needed new payment details. These are historic account instructions.

The final tariff explains older claims that cars cost £5.60 and small goods vehicles £11.20. Those westbound charges ended with abolition. A Season or Shared TAG then reduced frequent travel costs. There is no present resident scheme to join and no reason to renew a TAG for this crossing. Ask National Highways directly about any unresolved historic account balance; its current bridge page publishes no refund process.

Final westbound Severn charges before abolition
Former vehicle categoryBooth chargeSeason or Shared TAG chargeBasis
Cars and vehicles with up to nine seats£5.60£98.5622 trips per month
Goods vehicles up to 3.5 tonnes and small buses£11.20£197.1222 trips per month
Goods vehicles above 3.5 tonnes and large buses£16.70£330.6622 trips per month

Historic figures published by Highways England on 8 January 2018. They are shown to explain old receipts and search results; every current bridge charge is £0.

Does a motorcycle or Blue Badge holder need to apply for free travel?

No application is needed. The last charging order priced motor cars and motor caravans, goods vehicles and buses, and listed no charge class for motorcycles; every one of them now crosses for £0. A Blue Badge is irrelevant to the present bridge charge: the crossing is free even without one. A visitor driving a foreign registered car also has no plate to register for this bridge. The same is true if your car is hired, leased or registered in Scotland, Wales or Northern Ireland. Free travel is a property of the crossing, not an exemption granted after an eligibility check.

Motorway rules still govern access. The Highway Code excludes motorcycles under 50 cc, provisional motorcycle licence holders, cyclists and pedestrians. A caravan adds no bridge charge, but its driver must obey any temporary lane instructions.

Can a heavy lorry use the M48 Severn Bridge instead?

For an HGV over 7.5 tonnes, the M48 is normally not an available substitute. National Highways introduced a restriction there on 27 May 2025 because inspections found weakened main cables. It directs affected lorries to the M4 Prince of Wales Bridge and describes that detour as 14 miles. The operator currently says the restriction will remain until the end of January 2027 while a system to manage the spacing of heavy vehicles is prepared. That timetable may change, so check the live restriction page before dispatch.

The M48 exception list includes emergency vehicles, maintenance vehicles, buses, coaches and recovery vehicles responding to a callout on the bridge. Ordinary delivery lorries do not qualify. For planned overnight M4 closures, National Highways can allow heavy lorries over the M48 with controlled entry. During an unexpected M4 closure, affected HGVs follow the M5 and M50 route instead, approximately 100 miles. Use the signed arrangement in force on the day.

Example

A heavy goods delivery from Avonmouth towards Newport

Vehicle
Goods vehicle over 7.5 tonnes
Preferred crossing
M48 Severn Bridge when available to lighter traffic
Current restriction
Heavy goods vehicles above 7.5 tonnes directed to the M4
  1. Check the M48 restriction page before setting out, because the vehicle exceeds its current threshold.
  2. Use the M4 Prince of Wales Bridge instead. National Highways calls this a 14 mile diversion for affected HGVs.
  3. Budget £0 for the M4 bridge charge. The extra mileage is a route effect, not a replacement toll.

The M4 is the normal permitted estuary crossing for this lorry while the M48 restriction remains in force.

Why did the Second Severn Crossing have a toll?

Opened 1996 (National Highways: 'opened in 1996') as the Second Severn Crossing; renamed Prince of Wales Bridge in 2018. Tolls (westbound only) reduced 8 January 2018 on transfer to Highways England (Cat 1 £5.60, Cat 2 £11.20, Cat 3 £16.70), then abolished 17 December 2018. National Highways is re-waterproofing and resurfacing a 1km stretch of the cable-stay bridge (contraflow 8 Aug to 18 Sep 2026 per its travel-updates page).

What happens when wind closes a Severn bridge?

The two motorway bridges do not react to wind in the same way. National Highways says the Prince of Wales Bridge has barriers that reduce wind effects, while the older M48 bridge lacks them. When forecast gusts exceed 40 knots, stated as 46 mph, it closes the M48 and directs traffic onto the M4. When wind speeds exceed 70 knots, stated as 80 mph, both bridges close. The operator bases decisions on its own forecasts and monitoring equipment at the bridges, so a calmer reading in a nearby town cannot establish that a closure is unnecessary.

If both crossings shut, the signed route between England and Wales runs by the M5, M50, A40 and A449. Check each direction's live status and follow the signs. A high sided vehicle, caravan or motorcycle deserves particular care in gusts.

National Highways wind action for the Severn crossings
WindM48 Severn BridgeM4 Prince of Wales Bridge
Gusts expected above 40 knots, about 46 mphClosed to trafficUsually the signed alternative
Wind speeds above 70 knots, about 80 mphClosed to trafficClosed to traffic

These are the operator's published thresholds, not a guarantee that an incident or maintenance cannot close a bridge at a lower wind speed.

How did the Second Severn Crossing toll come to an end?

The bridge opened in 1996 as the Second Severn Crossing. It carried the M4 directly towards Newport and Cardiff, while the older crossing became the M48. The Severn Bridges Act 1992 provided for the new route and charging on both bridges. A commercial concession financed construction and addressed obligations for the existing bridge. Government accounts record its end on 7 January 2018; Highways England took over the next day.

A separate government order kept reduced westbound charges for part of 2018. The tariff table above shows the final prices. Legislation provided for a zero charge when vehicles were directed through the former toll areas and revoked the scheme at the end of December. National Highways still maintains the bridge, without billing each passing vehicle.

The name changed during the final charging year. A government announcement in April 2018 said that the Second Severn Crossing would become the Prince of Wales Bridge. Older route plans, invoices and travel reports may use either name for the same M4 structure. Do not confuse it with the original Severn Bridge on the M48, which also lost its toll but has different wind and weight constraints.

Common questions

Is the Prince of Wales Bridge toll free in both directions?
Yes. The UK Government ended charging on the M4 and M48 crossings in December 2018. Historically the toll was collected on the westbound trip into Wales, which is why older accounts focus on that direction. The eastbound return was already free. Today a driver owes £0 on either trip and passes through without a toll booth payment or later online transaction. Roadworks and wind closures can still interrupt travel, so check National Highways if you are planning a time sensitive journey across the estuary.
Do I need a TAG or an account for the M4 Severn crossing?
No. The Severn TAG was a prepayment system for the former westbound charge. Highways England published instructions for its account holders when it took over the bridges in January 2018, but those instructions belong to the charging era. There is no current account to open, number plate to register or deadline for paying after a journey. If you are looking at an old TAG statement, use its date to distinguish a historical transaction from the free crossing that applies now. National Highways handles bridge enquiries.
How much does it cost to take a van over the Prince of Wales Bridge?
The bridge charge is £0 for a van travelling either way. Do not use an old search result showing £11.20 as today's price. That was the former westbound rate for goods vehicles up to 3.5 tonnes after the January 2018 reduction. A heavier goods vehicle also pays no bridge toll, although its choice of alternative crossing is affected by the current M48 restriction for HGVs over 7.5 tonnes. Road conditions and the signed diversion matter more than the old tariff when planning a delivery.
Can my motorcycle use the Prince of Wales Bridge without paying?
An eligible motorcycle can cross the M4 bridge without a toll. There is no motorcycle registration or free pass to obtain. Motorway access is a different question: the Highway Code prohibits riders of motorcycles under 50 cc and people with provisional motorcycle licences from using motorways. A cyclist or pedestrian cannot use this M4 route either. During strong winds, follow the live bridge notices rather than treating free passage as a guarantee that the crossing remains open or suitable for riding.
Can an HGV use the original Severn Bridge if the M4 is shut?
Check the type of closure. National Highways normally directs HGVs over 7.5 tonnes away from the M48 because of a weight restriction introduced in May 2025. For a planned overnight M4 closure, it can temporarily manage those lorries across the older bridge using controlled entry at the M48 junctions. If the Prince of Wales Bridge closes unexpectedly, its published route for affected HGVs uses the M5 and M50 instead, approximately 100 miles. The live signs decide which arrangement is actually in force.
What should I do if both Severn motorway bridges close in wind?
National Highways says both bridges close when wind speeds exceed 70 knots, which it gives as 80 mph. Its wider diversion between England and Wales uses the M5, M50, A40 and A449. Check the operator's Severn Bridges status and follow roadside directions; local weather readings do not replace the forecasts measured for the bridges. If the M48 alone closes at the lower published wind threshold, traffic is generally directed to the M4 Prince of Wales Bridge. Leave room in your journey for the extra travel rather than waiting at a closed approach.
Why does an old receipt show a Prince of Wales Bridge charge?
A receipt dated before toll abolition can be genuine. Highways England collected a westbound charge after the bridges transferred to public control in January 2018, using a reduced tariff for cars, goods vehicles and buses. Charging ended in December of that year, while the Second Severn Crossing also gained its present name. Check the journey date and vehicle category against the historic table above. A demand for a new crossing is a different matter: there is no present Severn toll or current unpaid toll penalty to settle.